The cabinets are mostly finished. There are just a few more cupboard doors that need installing as well as the door knobs.
The mouldings at the top are installed and look quite impressive.
The base for our shower has arrived and is waiting for installation.
The base of the siding was installed yesterday. Darcy's still hoping to get in there today after work to bolt a post to the wall for a gate. Much more secure if this is done before the siding is on.
Lots of people are working there today, so stay tuned.
No comments:
Post a Comment